Skip to content
Snippets Groups Projects
user avatar
Larry Johnson authored
The ECC POST reported intermittent failures running after power-up on
the Korat PPC440EPx board.  Even when the test passed, the debugging
output occasionally reported additional unexpected ECC errors.

This refactoring has three main objectives: (1) minimize the code
executed with ECC enabled during the tests, (2) add more checking of the
results so any unexpected ECC errors would cause the test to fail, and
(3) use synchronization (only) where required by the processor.

Signed-off-by: default avatarLarry Johnson <lrj@acm.org>
4b3cc6ec
History
Name Last commit Last update
..